By pippy88
May 11, 2015
Over priced, incorrect installation, intolerant
Being disabled not understanding communication specifically written and verbal. The contract was signed in Sept 2013 and the work didnt start until Oct 2014. During this time we asked to be released from the contract but they would not let us. During the replacement of the evestrough they pulled the insulation causing further spread of mold. They didnt complete installing the ventilation in the roof which contributed to an increase of mold in the roof/ceiling. The downspout was assembled incor
>
Report
Are you the owner? Reply or Contact YP